Hi all,
I have a big problem:
I have two switches:
- one Cat 6509 with sup1/MSCF1
- and one Cat6509 with sup2/MSFC2 + Fabric enabled with gigabyte card fabric enabled.
i have configured an etherchannel link with two gigabit link (see jpeg):
so when i enabled the port on both catalyst 6500, i receive the following error on Cat6509 with sup2/MSFC2 :
: %EC-SP-5-CANNOT_BUNDLE2: Gi7/1 is not compatible with Gi4/1 and
will be suspended (vlan mask is different)
so, i entered to verify:
sh cdp nei 7/1 => ok
sh cdp nei 7/2 => entry not found
sh trunk and sh spantree are activate.and fowarding.
Help me please, i don't unsderstand why it doesn't run.
Regards
Silvere M.
I have a big problem:
I have two switches:
- one Cat 6509 with sup1/MSCF1
- and one Cat6509 with sup2/MSFC2 + Fabric enabled with gigabyte card fabric enabled.
i have configured an etherchannel link with two gigabit link (see jpeg):
so when i enabled the port on both catalyst 6500, i receive the following error on Cat6509 with sup2/MSFC2 :
: %EC-SP-5-CANNOT_BUNDLE2: Gi7/1 is not compatible with Gi4/1 and
will be suspended (vlan mask is different)
so, i entered to verify:
sh cdp nei 7/1 => ok
sh cdp nei 7/2 => entry not found
sh trunk and sh spantree are activate.and fowarding.
Help me please, i don't unsderstand why it doesn't run.
Regards
Silvere M.