Mailing List Archive

Upgrade to 2.63
Good afternoon folks,

Are there some problems with upgrading 2.60 to 2.63 or can I do the update
just without reconfiguring anything?

My predecessor recommended me not to upgrade if it's not hundred per cent
necessary.

I'm usin postfix 1.1.12 on Redhat 9.0.

T.i.a,

Thorsten Schacht
IT-Dept.

********* TC Works Soft- & Hardware GmbH *********

email: thorstens@tcworks.de
fon: +49 40 53 10 83 0
fax: +49 40 53 10 83 1
http://www.tcelectronic.com/
Flughafenstraße 52B - 22335 Hamburg - Germany

************* A TC Group company *****************
Re: Upgrade to 2.63 [ In reply to ]
On Mon, Feb 02, 2004 at 04:41:21PM +0100, Thorsten Schacht wrote:
> Good afternoon folks,
>
> Are there some problems with upgrading 2.60 to 2.63 or can I do the update
> just without reconfiguring anything?
>
> My predecessor recommended me not to upgrade if it's not hundred per cent
> necessary.
>
> I'm usin postfix 1.1.12 on Redhat 9.0.
>
> T.i.a,
>
> Thorsten Schacht
> IT-Dept.

I don't think any reconfiguration is needed. Some time ago I upgraded
our local ISP's SA from 2.60 to 2.61. After a week, we determined
that spam detection was reduced, so we reverted to 2.60. I have
recently upgraded that 2.60 installation to 2.63 and the spam
detection is as good or better than 2.60.

Cheers,
--
Bob McClure, Jr. Bobcat Open Systems, Inc.
robertmcclure@earthlink.net http://www.bobcatos.com
Eternity is a long time to think about what you should have done.