Quick question. We're setting up an M-40 with 2 gig-e interfaces so that
failure of either interface (or the switch its plugged into) doesn't mean
the M-40 is unavailable. We could setup VRRP between the interfaces, but
there is about 20 (and growing) sub-interfaces that need to be failed over
if one of the gig-e interfaces fail.
Is there an easier way to keep the two interfaces in sync other than
editing both interfaces by hand everytime a change has to be made?